Cement grinding is an effective method to improve the comprehensive utilization rate of cement. It can not only be used as gel material, but also has great application value in civil construction, water conservancy, national defense and other projects. The cement ball mill can not only grind cement very well, but also It has low dust, low noise, and low failure rate, so it is widely welcomed by the market. Therefore, this article will introduce to you in detail what are the detailed parameters of the cement ball mill? What is the cement process?
What are the detailed parameters of cement ball mill?
规格型号 | 筒体转速 (r/min) |
装球量 (t) |
进料粒度 (mm) |
出料粒度 (mm) |
产量 (t/h) |
电机功率 (kw) |
总重量 (t) |
Ф900×1800 | 36-38 | 1.5 | <20 | 0.075-0.89 | 0.65-2 | 18.5 | 5.85 |
Ф900×3000 | 36 | 2.7 | <20 | 0.075-0.89 | 1.1-3.5 | 22 | 6.98 |
Ф1200×2400 | 36 | 3 | <25 | 0.075-0.6 | 1.5-4.8 | 30 | 13.6 |
Ф1200×3000 | 36 | 3.5 | <25 | 0.074-0.4 | 1.6-5 | 37 | 14.3 |
Ф1200×4500 | 32.4 | 5 | <25 | 0.074-0.4 | 1.6-5.8 | 55 | 15.6 |
Ф1500×3000 | 29.7 | 7.5 | <25 | 0.074-0.4 | 2-5 | 75 | 19.5 |
Ф1500×4500 | 27 | 11 | <25 | 0.074-0.4 | 3-6 | 110 | 22 |
Ф1500×5700 | 28 | 12 | <25 | 0.074-0.4 | 3.5-6 | 130 | 25.8 |
Ф1830×3000 | 25.4 | 11 | <25 | 0.074-0.4 | 4-10 | 130 | 34.5 |
Ф1830×4500 | 25.4 | 15 | <25 | 0.074-0.4 | 4.5-12 | 155 | 38 |
Ф1830×6400 | 24.1 | 21 | <25 | 0.074-0.4 | 6.5-15 | 210 | 43 |
Ф1830×7000 | 24.1 | 23 | <25 | 0.074-0.4 | 7.5-17 | 245 | 43.8 |
Ф2100×3000 | 23.7 | 15 | <25 | 0.074-0.4 | 6.5-36 | 155 | 45 |
Ф2100×4500 | 23.7 | 24 | <25 | 0.074-0.4 | 8-43 | 245 | 56 |
Ф2100×7000 | 23.7 | 26 | <25 | 0.074-0.4 | 12-48 | 280 | 59.5 |
Ф2200×4500 | 21.5 | 27 | <25 | 0.074-0.4 | 9-45 | 280 | 54.5 |
Ф2200×6500 | 21.7 | 35 | <25 | 0.074-0.4 | 14-26 | 380 | 61 |
Ф2200×7000 | 21.7 | 35 | <25 | 0.074-0.4 | 15-28 | 380 | 62.5 |
Ф2200×7500 | 21.7 | 35 | <25 | 0.074-0.4 | 15-30 | 380 | 64.8 |
Ф2400×3000 | 21 | 23 | <25 | 0.074-0.4 | 7-50 | 245 | 58 |
Ф2400×4500 | 21 | 30 | <25 | 0.074-0.4 | 8.5-60 | 320 | 72 |
Ф2700×4000 | 20.7 | 40 | <25 | 0.074-0.4 | 22-80 | 380 | 95 |
Ф2700×4500 | 20.7 | 48 | <25 | 0.074-0.4 | 26-90 | 480 | 102 |
Ф3200×4500 | 18 | 65 | <25 | 0.074-0.4 | 按工艺条件定 | 630 | 149 |
Ф3600×4500 | 17 | 90 | <25 | 0.074-0.4 | 按工艺条件定 | 850 | 169 |
Ф3600×6000 | 17 | 110 | <25 | 0.074-0.4 | 按工艺条件定 | 1250 | 198 |
Ф3600×8500 | 18 | 131 | <25 | 0.074-0.4 | 45.8-256 | 1800 | 260 |
Ф4000×5000 | 16.9 | 121 | <25 | 0.074-0.4 | 45-208 | 1500 | 230 |
Ф4000×6000 | 16.9 | 146 | <25 | 0.074-0.4 | 65-248 | 1600 | 242 |
Ф4000×6700 | 16.9 | 149 | <25 | 0.074-0.4 | 75-252 | 1800 | 249 |
Ф4500×6400 | 15.6 | 172 | <25 | 0.074-0.4 | 84-306 | 2000 | 280 |
Ф5030×6400 | 14.4 | 216 | <25 | 0.074-0.4 | 98-386 | 2500 | 320 |
Ф5030×8300 | 14.4 | 266 | <25 | 0.074-0.4 | 118-500 | 3300 | 403 |
Ф5500×8500 | 13.8 | 338 | <25 | 0.074-0.4 | 148-615 | 4500 | 525 |
What are the application advantages of cement ball mill?
1. Good processing level: As seen above, it has many models, can handle 0.65-615t/h materials, and has good processing level.
2. Large crushing ratio: the finished product can reach 0.074-0.89mm, the discharge port is easy to adjust, and the product particle size is uniform.
3. Strong adaptability: not only dry grinding but also wet grinding can be carried out, and drying and powdering can also be carried out at the same time.
4. Easy to maintain: The structure is simple and solid, easy to maintain, reliable in operation, and can operate for a long time.
Cement production process
People who know a little bit about the cement production process will talk about "two grinding and one burning" when it comes to cement production. They are: raw meal preparation, clinker calcination, and cement grinding.
1. Raw material preparation: The vibrating feeder transports limestone, clay, iron ore and other cement production raw materials to the jaw crusher for crushing. The jaw crusher has a large crushing ratio and high processing level, and can crush the cement raw materials. It is very easy to crush. The crushed cement raw materials enter the cone crusher and are finely crushed again to make the raw materials initially uniform; the homogenized cement raw materials are put into the ball mill again for fine processing to reach the specifications of finished cement raw materials.
2. Clinker calcination: Put the raw cement meal into the rotary kiln for drying, preheating and calcination to make cement clinker in one go.
3. Cement grinding: Grind the produced cement clinker again to achieve refined production of cement clinker.